Beginning Volume 2 of My Layout Railfanning. Starting off with an eastbound stone train headed up by CSX and Chessie units. Following behind is a CP Rail mixed freight eastbound with mostly tankers. Up next our Chessie and CSX power set going back west bound with a short intermodal train for west yard. Next our CP Rail train pulls ahead to clear the mainline switch at east yard, next he backs his train down the mainline and into the loop, then preceeds to head around the loop track taking the secondary route back to west yard. Up next an eastbound NS box train. After arriving in the east yard the power detaches then backs down the main to clear the loop track preparing for a power wye. He then proceeds to run around the loop, before returning to east yard. Last but not least CP Rail proceeds to wye its power from the west yard running around the loop then heading back to the yard.
YouTube | May 23, 2008
